-
Reconstruction
of 4 cages in the chicken coup, each cage measuring 60 x 30 feet.
-
Reconstruction
of the slaughterhouse. The walls and the tables have to be covered
with tiles to improve hygiene, installation of stainless steel tables
and sinks.
-
Construction
of a smokehouse where meat can be smoked in an artisan way, to be
sold in the Casa Guatemala shop in Rio Dulce.
-
Construction
of an incinerator for burning rubbish and animal parts from the
slaughterhouse.
-
Construction
of a pier for unloading goods and machinery for the farm as well
as food for the animals.
-
Construction
of a warehouse for storing the food for the animals. The size of
this should be 30 x 60 feet and the ceilings should be 12 feet high.
-
Replace
the metal mosquito screens that cover the walls of the greenhouse.
-
Acquisition
of a mill to grind the grain for feeding the animals of the farm.
-
Construction
of a walkway to facilitate walking around the farm and the area
that is being reforested.
-
Three
water pumps for the fish ponds and for irrigating the plantations.
-
Acquisition
of pig breeders.
-
Acquisition
of barbed wire to surround the farm and for creating new courtyards.
-
Read
more about our new self-sufficiency project: Looking
for self-sufficiency in an unstable economy